Open 8am–8pm, 7 days a week · Fixed fee on every refurb · One team. Every trade. One price.
Services
📞 0330 122 6866Get a free quote →
Full refurbishments

Your whole home.
One team. One price.

A full house refurbishment is the most complex domestic project you can take on. Multiple trades, long programmes, endless decisions — all while trying to live your life. Hutch co-ordinates every element under one fixed fee, one project manager and one point of contact. You deal with one person. We handle the rest.

At a glance
£45k
Starting cost
8+
Trades co-ordinated
1
PM — your contact
10yr
Warranty included
Every refurb includes: fixed fee · free structural drawings · building regs · dedicated PM · weekly updates · 10-year warranty
8+
Trades co-ordinated
under one PM
1
Fixed price — confirmed
before work starts
£0
Cost overrun across
all Hutch projects
10yr
Workmanship warranty
on every project
Scope levels

From cosmetic refresh
to full gut renovation.

Full refurbishments vary enormously in scope. Here’s how we frame the four main levels — and what each typically costs.

Level 1
Cosmetic refresh
The house is structurally sound with working services. Everything that needs doing is cosmetic — decoration, flooring, updated fixtures and fittings. The most common scope for a new purchase that just needs refreshing.
Full redecoration — all rooms
New flooring throughout
Updated kitchen and bathrooms (cosmetic)
New internal doors and ironmongery
Lighting upgrades
Typical cost: £12,000 – £30,000
Level 2 — Most common
Full room renovation
Existing services are acceptable but the wet rooms, kitchen and decoration all need full replacement. The most common scope for a property purchased for renovation or after 15+ years without investment.
Full bathroom(s) strip and refit
Full kitchen strip and refit
New flooring and decoration throughout
New boiler and radiators
Consumer unit upgrade and partial rewire
Typical cost: £45,000 – £85,000
Level 3
Full renovation including services
Full gut renovation — all services replaced alongside all rooms. The scope for an older property with outdated wiring, original pipework or a property bought at significant discount because services need replacing.
Full rewire — new consumer unit, all circuits
Full replumb — new copper or plastic throughout
New bathrooms, kitchen and decoration
Full replaster of all walls and ceilings
New flooring and internal joinery
Typical cost: £85,000 – £145,000
Level 4
Full renovation + structural works
Everything in Level 3 plus structural alterations — wall removals, steels, layout reconfiguration, or the addition of an extension or loft conversion within the same programme. The maximum scope.
All Level 3 works
Structural wall removal(s) with steels
Layout reconfiguration
Extension or loft conversion if required
Free structural drawings included
Typical cost: £140,000 – £350,000+
Works we co-ordinate

Every trade.
One team.

A full refurbishment typically involves 8–12 separate trades working in sequence. Your PM co-ordinates all of them under one fixed price.

Full rewire
New consumer unit, all circuits, lighting and sockets throughout. NICEIC certified.
£4,500 – £8,500
🔧
Full replumb
New pipework throughout — copper or plastic. All hot, cold and waste runs replaced.
£5,000 – £9,000
🔥
New boiler & heating
New combi or system boiler, radiators and TRVs. Gas Safe certified.
£2,800 – £5,500
♨️
Underfloor heating
Wet UFH per floor or electric mat systems in wet rooms and kitchens.
£4,000 – £9,000/floor
🏙️
Structural alterations
Wall removals, RSJ and box steel installation, BCO sign-off. Free structural drawings included.
£6,000 – £18,000
🧱
Full replaster
All walls and ceilings — dot and dab or scratch and skim throughout.
£4,500 – £9,000
🍳
Kitchen renovation
Full kitchen strip and refit — standard to bespoke spec. All trades co-ordinated.
£14,000 – £55,000
🚿
Bathrooms (per room)
Full strip and refit of bathrooms, en-suites and cloakrooms.
£5,500 – £22,000
🪵
Flooring throughout
Engineered oak, LVT, carpet or tile — all rooms specified and fitted.
£4,000 – £10,000
🎨
Full redecoration
All rooms painted — walls, ceilings, woodwork. Colour consultation included.
£3,500 – £7,000
🚪
Internal joinery
New internal doors, skirting, architrave and ironmongery throughout.
£3,000 – £7,000
🏠
Loft conversion or extension
Add a loft or extension within the same programme — one fixed fee covering everything.
See service pages
Why Hutch for refurbs

Why a refurb needs
one company in charge.

📦
Sequencing is everything — and it’s hard
A full refurbishment involves 8–12 trades working in a specific sequence. First fix electrics must happen before plaster. Plaster before second fix. Second fix before tiling. Tiling before flooring. Flooring before decoration. Get the sequence wrong and you’re redoing work. Your PM manages this day by day.
🔒
One fixed price — regardless of complexity
A refurb where individual trades quote separately will almost always overrun. Trades don’t co-ordinate, extras get added, and there’s nobody accountable for the whole. Hutch prices the entire project upfront — one number, confirmed before work starts, that doesn’t change.
👤
One PM, one number, total accountability
On a refurb you need one person accountable for everything — not 8 different tradespeople each blaming the others when something goes wrong. Your Hutch PM is on site every day, answers every question, and owns the entire project from start to finish.
📐
Structural works included — free drawings
Most full refurbs involve at least one structural alteration — a wall removal, a steel beam, a layout reconfiguration. We include structural drawings and calculations free on every project. This eliminates the most common source of refurb budget surprises.
💰
Milestone payments protect your investment
A long-programme refurb involves significant money. Our milestone payment structure means you’re never far ahead of progress — and the final 10% is held until the project is fully complete and snagged to your satisfaction.
📱
Weekly updates — never left wondering
Refurbs run for months. We send a written update every Friday — what was done, what’s next, programme status, decisions needed from you. The most common complaint from clients who’ve used other builders is not knowing what was happening. We fix that structurally.
Pricing

Full refurbishment
cost guide.

Indicative ranges by scope level. Final cost depends on property size, condition and spec throughout.

Scope levelBest forProgrammeTypical cost
Cosmetic refreshSound property needing decoration and flooring4–8 weeks£12k – £30k
Full room renovation (bathrooms, kitchen, deco)15-year-old property, serviceable electrics and plumbing8–14 weeks£45k – £85k
Full renovation inc. rewire and replumbOlder property or significant project purchase14–22 weeks£85k – £145k
Full renovation + structural worksMaximum transformation — walls out, reconfigured18–30 weeks£140k – £250k
Full renovation + extension or loftAdding space at the same time as refurbishing24–40 weeks£200k – £400k+
All costs at standard spec for a 3-bed London terrace. Scale up for larger properties or premium spec.
The process

How a full refurb
actually works.

A full refurbishment is planned in phases. Here’s how a typical Level 3 refurb runs from start to finish.

1
Week 1–2
Site visit, scope and fixed price
PM attends site, assesses structural condition, existing services, access and any planning or building regulations requirements. Detailed scope of works produced covering every room and every trade. Fixed price confirmed in writing.
2
Weeks 2–4
Structural drawings, BCO and pre-construction
Structural drawings produced where required. Building regulations application submitted. Materials scheduled. All trades booked and sequenced. Party wall notices served where needed. Kitchen and bathroom designs finalised and signed off.
3
Weeks 4–8
Structural works and first fix
Any structural alterations completed. Full rewire first fix — consumer unit replaced, all circuits run to positions. Full replumb first fix — all new pipework run. New boiler and heating system installed. BCO inspection at structural stage.
4
Weeks 8–13
Plastering, bathrooms and kitchen
Full replaster of all walls and ceilings. Bathroom strip-outs and refits — fully waterproofed and tiled. Kitchen strip-out and refit including all second fix plumbing and electrics. BCO inspections for electrical and plumbing first fix.
5
Weeks 13–18
Second fix, flooring and decoration
Second fix electrics — all sockets, switches, lights and fittings. Second fix plumbing — all sanitaryware, taps and radiators connected. Flooring laid throughout. Full redecoration of all rooms. Internal joinery — doors, skirting, architrave.
6
Weeks 18–20
Snagging, BCO sign-off and handover
Formal snagging walkthrough — every item logged and resolved. Building regulations completion certificate obtained. Electrical test certificates and gas safe certificate issued. Full handover pack including all documentation. 10-year warranty certificate issued.
Featured project

Full 3-bed refurbishment,
Nunhead SE15.

£112k
Fixed fee
18 wks
Programme
3 bed
Property size
£0
Cost overrun
The project
A 3-bed Victorian terrace in Nunhead purchased by the client as a project property at auction. The house had been tenanted for 20 years — the wiring was original 1970s consumer unit and sockets, the plumbing was a mix of iron and copper, the bathrooms were original suite and the kitchen was beyond repair. The client wanted a fully renovated, move-in-ready property within 20 weeks of purchase.
Scope delivered within the £112,000 fixed fee
Full rewire — new consumer unit, all circuits, LED downlights throughout · Full replumb — new copper throughout, all hot and cold runs · New Worcester combi boiler and all radiators with TRVs · 2 full bathroom refits (main bathroom + en-suite to master bedroom) · Full kitchen refit — L-shaped mid-range, integrated appliances · Full replaster all walls and ceilings · Engineered oak flooring ground floor, carpet first floor · Full redecoration — all rooms, woodwork, ceilings · New internal doors, skirting and architrave throughout · Structural alterations — chimney breast removal ground floor, RSJ installed · Part P electrical test certificates · Gas safe certificate · Building regs completion certificate · 10-year Hutch workmanship warranty
I bought the house at auction knowing it needed everything. Three refurb companies quoted — two gave me estimates that ranged from £95k to £140k with no detail on what was included. Hutch gave me a 22-page scope of works, a fixed price of £112k and completed in 18 weeks. Move-in ready on the date they said.
MS
Marcus S.
Full 3-bed refurb · Nunhead, SE15
The complexity of sequencing 12 trades
A full refurb involves 12 separate trades working in strict sequence. Your PM’s most important job is maintaining that sequence — because delays cascade. On this project:

The structural works (chimney breast + RSJ) were completed first, making good before plastering began. First fix electrics and plumbing ran concurrently after structural — saving 2 weeks on programme. Bathrooms were run in sequence as rooms were plastered, rather than all at once — meaning one bathroom was available throughout. Kitchen last — to avoid it becoming a builder’s mess room. The sequence was planned at scope stage and stuck to throughout.
FAQ

Full refurbishment
questions answered.

For Level 1 (cosmetic) refurbs, most clients stay in the property. For Level 2 and above — particularly where services are being replaced and there are periods without power or water — we strongly recommend vacating for the main structural and first fix phase, typically the first 4–8 weeks. We advise specifically based on your scope.
It depends on scope and property size:
  • Cosmetic refresh (Level 1) — 4–8 weeks
  • Full room renovation (Level 2) — 8–14 weeks
  • Full renovation inc. rewire/replumb (Level 3) — 14–22 weeks
  • Full renovation + structural (Level 4) — 18–30 weeks
We set a specific completion date in your scope of works before work starts — and we commit to it.
For London homes, a well-scoped full refurbishment consistently returns more than its cost in added value. Properties in tired condition are typically discounted 15–25% below comparable renovated stock. We’re happy to discuss the investment case for your specific property at the site visit.
Yes, we regularly work in tenanted properties. We work with you on the notice requirements under the Landlord and Tenant Act, design the works sequence to minimise disruption, keep essential services live at all times, and liaise directly with tenants if that’s helpful.
Yes — and it’s often the most efficient approach. Running an extension or loft conversion within the same programme as a full refurb saves significant time and cost. We price the combined scope as one fixed fee — you don’t pay separately for two projects’ worth of mobilisation and overhead.
Add to your refurb

Combine with
other services.

Planning a full refurbishment?
Get a fixed-fee estimate in minutes. Site visit within 5 working days.